Marselle in South Lake Union, Seattle

Seattle Condo Buildings

Marselle

Mid-rise condo living between South Lake Union and Seattle Center.

699 John Street · South Lake Union · Seattle

Building note: WoodWorks construction study dates construction start to August 2007 and completion to April 2009. Mezzanine levels above the main wood floors may be counted differently from numbered residential stories.

Building Highlights

Built
2009
Stories
7 fl
Residences
132 homes
Neighborhood
South Lake Union
Developer
Sierra Construction (project records)
Architect
PB Architects

The Building Story

A Seattle condo that quietly pushed the possibilities of wood construction

Marselle, at 699 John Street, can appear to be a conventional seven-story city condominium. Its real architectural achievement is mostly hidden inside: the project used a concrete podium topped by five levels of wood framing and an additional wood mezzanine, taking advantage of local code provisions to push timber construction toward the zoning height limit. Architect PB Architects, structural engineer Yu & Trochalakis and contractor Norcon NW made the strategy central to the project's economics and design. It became a case study in the early South Lake Union era.

Marselle building exterior
Marselle building exterior

An engineering first

Five-and-a-half stories of wood above two of concrete

WoodWorks' published case study identifies Marselle as the tallest modern wood-frame structure in Seattle when it was completed. Its unusual combination of wood framing, a mezzanine and a two-story concrete podium fit within the then-applicable Type III-A construction rules and the 85-foot height limit. It is a striking example of how building code, materials and view opportunities shape residential architecture rather than merely constrain it.

Who made it happen

A collaboration across architecture and engineering

Marselle's project records credit PB Architects for design, Yu & Trochalakis for structural engineering, Norcon NW as general contractor and Sierra Construction as a development participant. The building was started in August 2007 and completed in April 2009, according to the published construction case study. The exact contractual roles matter because some directories list Sierra as 'developer' and others as a contractor. The sources clearly distinguish the architectural and structural designers; there is no reason to substitute one firm for another.

The mathematics of an extra half floor

When a mezzanine changed the development

The original project team took advantage of Seattle's 2003 building code, which allowed a more generous mezzanine footprint than the baseline international standard in the circumstances described by the case study. The wood levels were built above a fire-separated concrete podium, with construction details that allowed the project to approach the site's 85-foot zoning height. That unusual extra half level translated into residence layouts and view opportunities, not just an interesting entry in an engineer's portfolio.

The economic logic

Why the team preferred wood

A Norcon executive told the WoodWorks case-study authors that building the same project entirely in concrete would have increased costs by roughly 30 percent, while a steel alternative would have taken longer. That is a contemporaneous project-team estimate, not a verified current cost comparison. The point is that efficient timber framing enabled a more feasible multifamily project in an expensive downtown-edge location. The team also described faster progress than a nearby concrete-and-steel hotel project with a similar floor footprint.

Energy and environmental aspirations

Built Smart and Built Green in 2009

The development received Seattle City Light Built Smart recognition and was constructed to the Master Builders Association's Built Green program, according to the case study. That placed environmental performance within an engineering story that was also driven by cost and construction speed. Historical certification is worth documenting, but it says nothing by itself about today's energy bills, window condition or the funding of future projects. Those questions belong to current ownership and association records.

A different kind of penthouse

Two-level homes and the rooftop deck puzzle

A 2008 presales report described ten two-level penthouse homes, with mezzanine levels that set them apart from ordinary flats. Historical accounts also describe multiple communal rooftop decks, although sources differ on whether there were three or four. A buyer should tour the exact residence, check where stairs and upper floors meet the approved plan and distinguish private terrace rights from common roof spaces. Building height and roof labels in advertising can vary depending on whether the mezzanine is counted as a story.

Where Marselle sits today

An early chapter in the changing South Lake Union edge

Marselle's 132 homes arrived when John Street and the Denny Triangle were undergoing rapid reinvention. Its construction technique is a distinctive historic achievement, not a basis for assuming today's systems need no work. The most relevant current questions are the maintenance of roof and exterior assemblies, the concrete-to-wood interface, fire-safety components, parking and the association's capital budget. A striking engineering origin makes the building worth understanding in depth, but sound ownership still requires the latest documents.

Good to know

Before choosing a home here

  • Confirm the actual mezzanine, usable floor area and roof-deck rights for any upper-floor home.
  • Review current building-envelope, waterproofing, fire-safety and reserve records without inferring modern performance from original certification.
  • Clarify whether the unit's parking and storage legally convey, and confirm which roof areas are common versus private.
Explore the research behind this building

Architecture and project-history references describe the original design. Current amenity access, financial condition, building rules and individual property features must be verified from the latest association and listing records.

Homes for Sale

Currently available at Marselle

Explore available homes, photography and pricing from the live NWMLS feed.

Pinnacle GroupLuke Bartlett

Listing data is provided by Northwest Multiple Listing Service (NWMLS) through IDX Broker. Information is deemed reliable but not guaranteed and must be independently verified.

Building amenities

  • Multiple rooftop decks
  • Billiards
  • Owner lounge
  • Wellness / fitness space
  • Parking
  • Storage
Parking
Resident parking

Amenities are reported in public building and listing sources. Confirm current access, reservations, fees, and any parking or storage assignment with the association.

Building photography

2 photographs of Marselle.

Rental & Leasing

Leasing at Marselle

Rental cap
No building rental cap · publicly reported
Minimum lease
Current HOA documents required
Short-term rentals
Current HOA documents required
More rental details
Cap status / waitlist
No building rental cap publicly reported
Subleasing
Current HOA details required
Lease / registration
Current HOA details required
Rental / move-in fees
Current HOA details required
Background checks
Current HOA details required
Source status
Verified public source
Last verified
August 10, 2026

Leasing rules and availability may change. Confirm current terms with the condominium association before purchasing or leasing.

What Buyers Should Know

Due-diligence checklist

  • Resale certificate
  • Reserve study
  • Budget and financial statements
  • Insurance
  • Assessments
  • Capital projects
  • Litigation
  • Rental rules
  • Owner occupancy
  • Financing / warrantability
  • Parking and storage rights
  • View / future development
  • Building systems and age

What Sellers Should Know

Who you compete with

Sellers compete with current same-building inventory, similar stacks, floor height, views, parking, condition, amenities and nearby buildings.

Compare This Building

Other buildings in the directory

Work with Luke

Considering a condo at Marselle?

Association rental and leasing rules, rental caps, current cap availability, waitlists, minimum lease terms, fees and short-term-rental policies can change at any time. Information should be independently verified through the current resale certificate, declaration, rules and regulations, association management and applicable City of Seattle requirements before purchase or lease.